Teignmouth Fish Quay

For Interserve

November 2015

TMS were engaged by Interserve to commence
works in November 15 to demolish the existing
timber fish quay and construct a replacement steel
sheet piled marine structure on the popular Back
Beach area of Teignmouth, Devon. The location
of the site meant that the works took place in
very close proximity to residential properties and
beach users. Construction methods, working
hours and selection of plant was therefore of
critical importance so as not to adversely disturb
neighbours to the site and affect the peaceful
enjoyment of the beach by the local community
and tourists.

View Project

Pontoon Piles, Newhaven

For Rampion Offshore Windfarm

5 Months

Working on behalf of Knights Brown, TMS were appointed to complete the marine works for the installation of new
pontoons at Rampion Offshore Wind Farm’s landing facility in the Port of Newhaven. TMS completed the piling works from marine
floating plant with a 135t crawler crane and 60t long-reach mobilised on the barge deck. The piles were installed using a PVE 25M
standard frequency vibro hammer. All of the new pontoons were successfully configured on the new piles as all of the piles were
positioned within small tolerance

View Project

Newquay North Quay Refurb

For Cornwall County Council

24 Weeks

TMS Maritime were awarded the Design and Build contract for the restoration and refurbishment works to Newquay Harbour’s North Pier.
The historic North Pier is constructed of mortared granite masonry, built in the mid 19th century and is Grade 2 listed. The Pier extends from
North Quay Road approximately 70m out into Newquay Harbour. The Quay / Pier is 16m wide and the Pier height increases from 6.5m to
9.9m above adjacent beach level.

View Project

Isle of Man Sea Terminal

For Bam Nuttall

August 2018

In August 2018, Teignmouth Maritime Services were contracted by BAM Nuttall to carry out various scopes of work at the Sea
Terminal in Douglas Harbour, Isle of Man. These consisted of scour protection to the two Ro Ro ferry berths, linkspan hoist tower
piles life extension (consisting of repair sleeve and denso sea shield), installing a new fender pile and repairs to previously damaged
piles; and sea shield work to the three walkway dolphins that are situated within Douglas Harbour

View Project

Ilfracombe Sea Wall Repairs

For North Devon District Council

Working on behalf of North Devon District Council, TMS
were appointed to complete sea wall repair works to a section of wall
in the inner harbour. Areas of the existing wall has signs of existing
repairs. The historic harbour which was built in the 12th century has
been a popular tourist attraction and is still today a working harbour
with fish and seafood being landed daily

View Project

Fender Installation, Falmouth

For A&P County Wharf

August 2022

In August 2022, Teignmouth Maritime Services were contracted by
A&P County Wharf at Falmouth Docks to install three new fender units
to replace the failed wooden fenders that were already in situ.
With input from TMS Ltd, the design solution used a pre-fabricated
fender head unit supported on 4 driven piles. The bespoke-designed
fender head was fabricated by TMS’s BS EN ISO1090 accredited
welders.