As a leading marine contractor, TMS pride themselves in being able to offer our clients all ranges of quayside fendering options. Regardless of the scope of work involved, we ensure that quality, efficiency, and client satisfaction are considered throughout the entire project lifecycle.
We endeavour to be completely transparent with our clients in order to build a working relationship on trust and honesty. Therefore, if structurally viable, we offer both reconstruction and maintenance of existing fendering as an alternative to the supply and installation of brand new fendering.
TMS are experts at installing or maintaining quayside fendering and their workmanship can be seen in many locations throughout the UK.
Latest Projects
Harbour Wall Remedial Works at Brunswick Wharf
For Red Earth Bideford
The Harbour Wall Remedial Works Project undertook a comprehensive approach to address a range of repair needs for
the masonry harbour wall situated at Brunswick Wharf in Bideford.
Watchet Quay Wall Repair
For Somerset West and Taunton Council
TMS were awarded the design and build contract for repair works at East
Quay, Watchet Harbour. The project included the installation of a 42 m
section of new sheet pile wall and waling beams. The existing sheet piled
quay wall, used as both a leisure and commercial facility, had failed and
was collapsing into the harbour.