Wear Farm Cofferdam

TMS have been working locally installing a cofferdam at Wear Farm Railway line. We have installed 90 piles to create the culvert, frames inside the cofferdam were installed to add extra strength to allow the work to be carried out safely, this will enable Balfour Beatty to repair the collapsed pipe under the track. TMS used our safety boat ‘Petrel’ to push the two barges ‘Ash’ & ‘Bond’