TMS have started laying the limestone setts from the reclaimed stone that were on the top of the old plinth, which had been broken out prior to the beginning of the works.

When installed the new limestone setts create a frame around the newly laid slabs on the higher plinth. We have been busy forming the new transition steps from the lower plinth to the higher level plinth, using a light weight Material blocks and wrapping them in polythene before fixing steel reinforcement rebar cages. A stepped shutter was then placed and fixed to the cages & concrete was then poured to create the new steps which now joins the two levels