Lake Windermere

TMS have been awarded the works at Ghyll Head jetty on Lake Windermere,  this project consists of removing an existing 20m wooden jetty along with an existing  20mx10m concrete slipway, we will then be installing a new reinforced concrete slipway alongside permanent timber piles as construction of the new wooden jetty, for access to the lake. All of the works will need to be carried out afloat from a uni-float barge, this will have been constructed & installed on the opposite side of the lake at Lakeside.