TMS are currently in the process of repairing the gates and hinges on the historic grade 2 listed sea lock gates at Bude.
Initially parts of the gates had to be removed in situ to allow the main section to be lifted from the lower hinge.
The gates were lifted and lowered to the quay side where an inspection took place to ascertain the repairs required which are on going at present.